Refineries & industrial facilities

Keep complex repairs moving.

EQUA AIMMS is a voice-first AI maintenance teammate for process equipment, pumps, compressors, and plant utilities. It coordinates the digital work around a repair, so planners, stores, suppliers, and trades have the context to act.

Talk to AIMMS on iOS or Android, or work hands-free with our EQUA smart glasses. One interface across your existing systems. Your permissions. Your approvals.

What you get The repair scope, equipment history, procedures, part specification, supplier response, and approval path brought together around the job.

  • Customer-defined permissions
  • Read-only operating context
  • Physical work stays with qualified people
Process plant with columns, pipe racks, and maintenance platforms
Process equipment and plant utilities

Existing systems remain in place · Customer-defined approvals · No live equipment commands

Where work waits

Three handoffs can slow a complex repair.

Follow the repair through the people and systems that need to agree before work can proceed.

  1. The installed equipment and the record need to agree.

    01 Equipment configuration and history Maintenance workflow
    During the repair

    An uncertain installed variant can hold up the part decision.

    What AIMMS changes

    Brings drawings, history, and the stores record together and surfaces discrepancies for review.

  2. The specification has to travel with the request.

    02 Parts and supplier coordination Maintenance workflow
    During the repair

    A quote without the right technical details can send the work back for clarification.

    What AIMMS changes

    Checks available stock and prepares supplier requests and comparisons within the customer’s rules.

  3. The job crosses planning, stores, and trades.

    03 Work readiness and closeout Maintenance workflow
    During the repair

    Each handoff needs the current repair scope and the next accountable action.

    What AIMMS changes

    Keeps the work context, dependencies, approvals, and findings together around the asset.

These are workflow considerations, not measured sector statistics or a claim about your facility.

Published third-party sector research does not establish AIMMS effectiveness. Only a baselined deployment on the customer's own workflow can do that.

Your own arithmetic

Put a number on the time a repair waits for coordination.

Use your own work history to estimate the annual time between identifying a repair and having an approved, executable work path. The example is not an AIMMS result.

The starting values are an editable example, not your operating data or a measured result.

Replace the example with numbers from your maintenance records.

The controls start with an editable example. Displayed values describe exposure, not savings or an AIMMS effect. Nothing you type here leaves your browser.

This section needs JavaScript to do your arithmetic. The figures beside it are the worked example for 10 process-equipment repairs a year at 8 waiting hours each. To use your own numbers, open the full value model.

Example annual coordination exposure 10 × 8 h

80 hours a year

Estimated annual time spent waiting for work readiness.

Enter an hourly value only if it represents costs or losses that shorter downtime could avoid.

Add an hourly value if you can support one.

Continue to the full value model

Only an event count you changed and a valid hourly value you entered carry forward. Enter your own estimates of coordination time saved and avoidable downtime there; waiting time is not automatically savings.

See AIMMS in action
What the plant gets

Give every trade a clearer path to the repair.

These are operating outcomes the workflow is designed to support, not a projection of results at your facility.

One scope across the trades Bring the verified equipment configuration, procedures, work assignments, and dependencies together. Operating outcome
A parts decision with context Carry the required specification, stock check, supplier quotes, and receiving status through the job. Operating outcome
Knowledge stays with the asset Capture findings, parts, checks, and the repair outcome for the next investigation. Operating outcome
Plant authority stays with people Qualified personnel control isolation, physical work, safety, and return to service. Outside AIMMS scope

Your KPI contract Start with a repair and baseline the delay in your own operation. Agree on the measures and workflow before assessing results. See what the first deployment measures.

Explore the value model using your own assumptions
Measure your own workflow

Baseline the work that keeps the repair waiting.

Choose measures with the team and compare the selected workflow against its own baseline.

Time to ready work
Elapsed time to an authorized, executable work path.
Parts certainty
Installed specification and usable stock confirmed.
Supplier cycle
Time to usable quotes and purchasing decisions.
Coordination effort
Time spent on information gathering and handoffs.
Repair duration
Elapsed time from the fault through verified completion.
Closeout quality
Required findings, checks, and records captured.
Process equipment · A repair spanning teams

A parts question can hold up the job.

A process-pump repair needs a seal kit, but the installed configuration and parts list disagree. Planners, stores, trades, and suppliers need a confirmed specification and a clear next action.

Where elapsed time accumulates

  1. 01 Fault and asset identified
  2. 02 Installed configuration reviewed
  3. 03 Specification discrepancy surfaced
  4. 04 Stock and supplier options checked
  5. 05 Approval and work coordinated
  6. 06 Repair and return documented

An unresolved specification stays visible until an authorized person resolves it.

A process-pump repair The job waits for a verified part and authorized work.

Example elapsed clock for one repair

8 of 13 modeled hours are time spent coordinating work in this example.

  1. 2 h Evidence and history assembled Waiting on coordination
  2. 3 h Specification and stock checked Waiting on coordination
  3. 3 h Supplier and approval coordinated Waiting on coordination
  4. 4 h Physical repair Hands on the asset
  5. 1 h Plant checks and authorized return Verified and returned

Example timing. Actual intervals depend on your equipment, work scope, and approvals.

Stated-premise model

What coordination time adds up to over a year.

An example operation has 10 corrective jobs a year, each with 8 hours waiting for an executable work path.

10 corrective jobs per year
An example assumption, not a sector benchmark.
8 h waiting per job
Time spent preparing the work path, not physical repair time.
0 h improvement assumed
No AIMMS effect is included.
One hatched tile is one modeled event. Hatched fill marks the stated-premise model.

80 modeled coordination hours a year

An illustration of time spent preparing work, not a claim of time saved.

10 jobs multiplied by 8 waiting hours is 80 hours. Replace the assumptions with your own records in the calculator.

Modeled from the stated assumptions. No AIMMS effect is applied.

Start with a recurring repair

Choose equipment and work your teams know.

Begin with an asset family or repair workflow where a handoff or specification is slowing work.

Industrial process equipment and connected pipework
A repair crosses planning, stores, trades, and suppliers.

Process equipment

Pumps, compressors, heat exchangers, motors, drives, and associated equipment.

Plant utilities

Cooling, compressed air, electrical support, and utility equipment.

Parts and stores

Installed configurations, critical spares, inventory, specifications, and suppliers.

Planning and trades

Procedures, assignments, dependencies, approvals, field findings, and closeout.

FAQ · Refineries & Industrial Facilities FAQ

Questions from operations, planning, stores, and IT.

Start with the workflow, the systems, and the authority your people retain.

Select a question to read the answer.

Can we start with inconsistent equipment and parts records?

Yes. Start with the records you have. AIMMS brings permitted asset and parts context into one interface, while planning and stores review discrepancies. An uncertain specification stays visible for a qualified person to resolve.

Does AIMMS replace our existing systems?

No rip and replace. AIMMS connects permitted information across existing CMMS, EAM, ERP, field-service, inventory, and supplier workflows. Teams can ask naturally while authorized digital work moves within customer-defined permissions and approvals.

How do we introduce AIMMS to the team?

Begin with guidance on a selected repair. People can use natural voice or text in one interface, then expand autonomous digital coordination as the team validates the workflow and sets permissions and approval points.

Who controls isolation and return to service?

Qualified site personnel control isolation, physical repair, safety, and return to service. AIMMS uses read-only operating context and does not command equipment.

Tell us how your team works. We’ll make the next step concrete.

See AIMMS in action

Which handoff keeps the job waiting?

Tell us about your maintenance priorities and the handoffs between planning, trades, stores, and suppliers. We will discuss the workflow and potential value, then show a relevant example as time permits.