Your own arithmetic The repair takes hours. The waiting takes days.
Your team is not slow. The work around the repair is. Put in your last critical
repair and see the split. We do not project a result onto your numbers.
Drag both controls. Use your own last repair.
This section is a calculator. Without JavaScript the controls cannot compute, so the
figures beside this paragraph are a worked example on a 38-hour repair rather than
anything you entered. The point it makes does not depend on the arithmetic: on a
critical repair, most of the elapsed time is spent waiting on coordination rather than
on the asset.
The ledger uses only the two values you enter and applies no assumed AIMMS effect.